EIAR Appendices


Appendix 2-1 Planning Application History within 1km of the Proposed Development

Appendix 2-2 Scoping Response

Appendix 2-3 King Knocknacarra Cumulative Long List Applications

Appendix 3-1 LRD Opinion Letter issued by Galway County Council on the 25th of April 2026

Appendix 4-1 Construction Environmental Management Plan

Appendix 4-2 Climate Scheme Sustainability Statement 

Appendix 4-3 Civils Works Design Report 

Appendix 4-4 Architectural Design Statement 

Appendix 5-1 Human Health Assessment Guidelines

Appendix 6-1 Baseline Bat Report

Appendix 6-2 Invasive Species Management Plan

Appendix 6-3 Landscape Design Rationale Report

Appendix 6-4 Site Lighting Report

Appendix 6-5 Bat Derogation License

Appendix 7-1 Ground Investigation Report, Causeway 2019

Appendix 7-2 Ground Investigation Report, Causeway 2025 (1 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (2 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (3 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (4 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (5 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (6 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (7 of 8)
Appendix 7-2 Ground Investigation Report, Causeway 2025 (8 of 8)

Appendix 7-3 Geo-environmental Interpretive Report, MKO 202 (1 of 3)

Appendix 7-3 Geo-environmental Interpretive Report, MKO 202 (2 of 3)

Appendix 7-3 Geo-environmental Interpretive Report, MKO 202 (3 of 3)

Appendix 8-1 Flood Risk Assessment 

Appendix 8-2 Laboratory Reports Surface Water

Appendix 8-3 Laboratory Reports Groundwater

Appendix 8-4 Water Framework Directive Report

Appendix 10-1 Climate Change Legislation

Appendix 10-2 Carbon Calculations

Appendix 11-1 Construction Noise Levels

Appendix 11-2 Construction Noise Impacts

Appendix 11-3 Cumulative LRD construction Noise Levels

Appendix 11-4 Cumulative LRD construction Noise Impacts

Appendix 11-5 Cumulative Onsite & Offsite Construction Noise Levels

Appendix 11-6 Cumulative Onsite & Offsite Construction Noise Impacts

Appendix 12-1 Photographic Records

Appendix 12-2 Summaries of Archaeological Excavations

Appendix 12-3 Architectural Conservation Report

Appendix 12-4 Strucutral Integrity Report 

Appendix 13-1 LVIA Methodology

Appendix 13-2 Photomontage Booklet

Appendix 14-1 Flood Risk Assessment 

Appendix 15-1 Traffic Impact Assessment

Appendix 15-2 Road Safety Audit

Appendix 15-3 Junction 1 Arcady Analysis 

Appendix 15-4 Junction 2 Arcady Analysis

Appendix 15-5 Design Manual for Urban Roads and Streets (2019)